Commercial work spans transaction due diligence, ground-up development, tenant improvements, and facility documentation. Here’s where we typically support project teams.
These three services represent the highest-volume commercial requests. Click any service for full details, scope, and what to expect.
Transaction-grade surveys delivering Table A items, coordinated with title and lender, built to current 2026 ALTA/NSPS standards.
Learn moreDesign-ready topographic mapping and 3D surface for civil and architectural coordination, often combined with boundary as a single design base.
Learn moreBoundary establishment for acquisition, design, and development decision-making — backed by record research and field evidence.
Learn moreCommercial projects often require specialty mapping, construction support, or advanced reality capture deliverables. Here’s the full range.
Commercial deliverables are built for design, due diligence, and construction workflows — coordinated with title, structured for CAD/BIM teams, and ready to integrate with your project documentation.
We confirm the deliverable, requested standards (ALTA Table A, agency, lender), CAD/BIM format, and project timeline with your team.
We review parcel records, prior surveys, and any title documentation provided. For ALTA work, we coordinate directly with title.
Our crew collects boundary evidence, topographic data, building features, or construction layout points using integrated methods (RTK GNSS, robotic total stations, 3D laser scanning, UAV).
We process field data, perform quality control, and prepare deliverables in your required format.
Final deliverables go to your team with clear documentation. For ongoing projects, we remain available for clarifications, revisions, and follow-on scope.
California PLS #8099 oversees every project. Surveys are signed by the licensed surveyor responsible for the work — no outsourcing
Our field-to-finish automation workflow delivers commercial-grade survey products faster than traditional production cycles.
CAD-ready deliverables structured for Civil 3D, AutoCAD, and Revit. Scan-to-BIM scope confirmed upfront so deliverables match your team’s workflow.
Nineteen years of LA and Ventura County commercial work — including title coordination, agency standards, and the complex parcel conditions common in established markets.
We typically need the property address, current preliminary title report, lender requirements (if applicable), and the requested Table A items. We coordinate directly with the title company to confirm easements and exceptions for accurate plotting.
Yes — and we recommend it for most commercial design projects. Combining topo and boundary in one mobilization avoids return site visits, gives your civil and architectural teams everything they need on a single coordinated base, and reduces total project cost.
Topographic surveys typically deliver in 1–2 weeks for small-to-mid sites; ALTA surveys are 2–4 weeks depending on title complexity and Table A scope. Construction staking turnaround depends on contractor schedule. We confirm timing with each proposal.
Yes. We capture with terrestrial LiDAR, register point clouds to project control, and deliver BIM ready models (typically Revit) at the level of detail (LOD) confirmed with your team upfront.
Yes. The 2026 ALTA/NSPS Land Title Survey Standards took effect February 23, 2026, and we deliver to those standards. The most significant changes are a restructured Table A (now 20 items), a new mandatory encroachment summary table, and updated imagery rules. See our blog post on the 2026 standards for details.
Yes. Default deliverables include PDF (signed/stamped where required) and CAD files (DWG/DXF) developed following National CAD Standards and structured for Civil 3D and AutoCAD. We confirm coordinate system, layering conventions, and file format with your design team upfront.
Yes. We schedule layout in coordination with your GC’s construction sequence, including foundation staking, building corners, utility offsets, and curb/grading layout. Many commercial projects involve multiple staking visits across the build cycle.