Public agency and infrastructure work has its own requirements — agency standards, traffic control, prevailing wage compliance, and procurement workflows. Here’s where we typically support project teams.
These three services represent the highest-volume public works requests. Click any service for full details, scope, and what to expect.
Topographic mapping for streets, corridors, and public facilities — built to agency standards and CAD-ready for design teams.
Learn moreLayout for public improvements — utilities, curb/gutter, ramps, grading, and structures — coordinated with contractor schedules and agency inspection.
Learn moreExisting conditions, control, and mapping for engineering design and PS&E sets — formatted to agency requirements.
Learn morePublic works projects span design, construction, ROW acquisition, monitoring, and closeout. Here’s the full range of support we provide.
Public works deliverables are built to agency standards — formatted for design teams, structured for procurement and inspection, and documented for the public record.
We confirm agency standards, CAD format, control requirements, deliverable schedule, and any procurement or compliance requirements with your team.
We review available record information, existing control, and prior surveys relevant to the project.
Our crew collects topographic, boundary, control, or staking data using integrated methods, with appropriate traffic control and safety protocols for the work environment.
Field data is processed, controlled, and quality-checked against agency requirements.
Deliverables are provided in agency-ready format, with documentation supporting review and inspection. We remain available for revisions, follow-on phases, and ongoing support across the project lifecycle.
California PLS #8099 oversees every project. Direct access to the responsible licensed surveyor — no project-management layer between you and the technical decisions.
Small Business Enterprise certified, supporting agency procurement and small business participation requirements on public projects.
Deliverables structured to agency CAD standards, control requirements, and inspection documentation — not generic “commercial” output that needs reformatting.
Field-to-finish automation accelerates production without compromising the quality and documentation public projects require.
We typically need the property address, current preliminary title report, lender requirements (if applicable), and the requested Table A items. We coordinate directly with the title company to confirm easements and exceptions for accurate plotting.
Yes — and we recommend it for most commercial design projects. Combining topo and boundary in one mobilization avoids return site visits, gives your civil and architectural teams everything they need on a single coordinated base, and reduces total project cost.
Topographic surveys typically deliver in 1–2 weeks for small-to-mid sites; ALTA surveys are 2–4 weeks depending on title complexity and Table A scope. Construction staking turnaround depends on contractor schedule. We confirm timing with each proposal.
Yes. We capture with terrestrial LiDAR, register point clouds to project control, and deliver BIM ready models (typically Revit) at the level of detail (LOD) confirmed with your team upfront.
Yes. The 2026 ALTA/NSPS Land Title Survey Standards took effect February 23, 2026, and we deliver to those standards. The most significant changes are a restructured Table A (now 20 items), a new mandatory encroachment summary table, and updated imagery rules. See our blog post on the 2026 standards for details.
Yes. Default deliverables include PDF (signed/stamped where required) and CAD files (DWG/DXF) developed following National CAD Standards and structured for Civil 3D and AutoCAD. We confirm coordinate system, layering conventions, and file format with your design team upfront.
Yes. We schedule layout in coordination with your GC’s construction sequence, including foundation staking, building corners, utility offsets, and curb/grading layout. Many commercial projects involve multiple staking visits across the build cycle.